OUR COMPLETED PROJECTS
Package 16 (11.8km): Development of Jakh (Vijaypur) Kunjwani section of NH-44 to 6-lane Expressway standards (Design Km 503.200 to Km 515.000 of Ch. 0 to 7.385 of NH-144A Spur Connectivity to Jammu Airport)ription
Package 17 (13.3 km + 15.62 km) Development of Kunjwani to Sidhra Section of NH-44 (Km 515.000 to Km 528.300) and Domel to Katra Section (Km 550.900 to Km 566.520)
Bengaluru -Vijsyawada under Bharatmala Pariyojana Phase-I (Package - 1 and Package - 4) in the state of Andhra Pradesh. The bid for the lenders floated by the National Highways Authority of India on Hybrid Annuity basis. The total project cost is Rs 1373.60 crore.
Construction of 31.7 km long 4 Lane Bypass connecting NH-56 at km 17.400 and terminating near Behta Village Road under NHDP Phase-VII on EPC mode' namely 'Lucknow Ring Road Package I'
Four Laning of Koilwar to Bhojpur from Km. 137.375 of NH-30 to Km. 27.370 of NH-84 (Design Chainage Km. 33.250 to Km. 77.100) in the State of Bihar under NHDP Phase-III on EPC mode
4 Laning/ 2-Laning with paved shoulder of Dausa-Lalsot-Kauthun section on Hybrid Annuity Mode.
Construction of Eight Lane access-controlled expressway starting from Junction with NH-47 near Bhamaiya village and ending at Junction with SH-175 in Baletiya village in Panchmahal district (Ch. 780+920 to 803+420; design Ch. 328+500 to Ch. 351+000) section of Delhi – Vadodara (Pkg 29) Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat